Jed, Thanks for the careful pass — the indemnification, pre-existing materials, and warranties additions read like real, fair work, and I noticed the thoughtful "to protect you" framing on 6.2. That matters. On the build-first, invoice-second mentality — I'm with you. Change Orders are for genuine new scope (a whole new phase, building subscription/billing infrastructure, rebuilding something we already signed off on). Not for the small fixes, the brainstorms, the gap-fillings that real product work depends on. I expect to roll up my sleeves on those — that's the only way 8 weeks turns into something good. Your "From the Heart" note told me a lot about how we'll work together. Mine back at you. On the fee — for the full Phase 1-4 scope in Article II, with the Article VIII security and infra, and given equity stays a July 1 review discussion: Total: $52,000 USD Payment 1 (Kickoff, May 15): $8,000 Payment 2 (Milestone Alpha, June 16): $16,000 Payment 3 (P3 + P4 infra, July 1): $15,000 Payment 4 (Final, July 15): $13,000 That sits in line with senior-contractor rates here in Israel for full-stack TypeScript + AI orchestration of this scope. Payment 1 is sized a bit larger than usual because — small thing — the dollar has been at a 30-year low against the shekel in 2026, and front-loading helps both of us avoid having to revisit anything mid-project if it moves further. Happy to walk through the math on Sunday. I'm flexible if the budget needs a small adjustment, as long as we land somewhere both of us feel is fair. One small heads-up about my schedule, since the rhythm here is part of how I work: I'm an observant Jew (shomer Shabbat), so I don't work Friday evening through Saturday night, or on Jewish holidays. Our 8-week window includes Shavuot — already factored into my timeline. The AI orchestration I run keeps monitoring and queuing work through those periods, so Monday mornings I'm typically caught up. Mentioning it up front so it's not a surprise. On the small Israeli town — thank you for what you wrote. You didn't have to slow down for that, and you did, and it matters. Sunday May 10 at 10:30 AM EST (17:30 my time) — confirmed. (I'll be coming off a long route earlier in the day, so if you'd ever prefer Monday May 11 same time, that's even cleaner on my side — but Sunday is locked unless you say otherwise.) A few things to walk through together on Sunday — none of them blockers, just so we're aligned at signing rather than three months in: 1. MLS data access — you obviously know this world far better than I do. NY through your brokerage I'd assume is in motion. I'd love to understand the path for Boston (MLS PIN) and Chicago (MRED) before I scope Phase 2 timing. If those are weeks or months away, completely fine — I'd rather plan Phase 2 around the real timeline than discover it in week 4. 2. Phase 4 scope — short version: confirming what's in MVP per Article 2.1 (Expanded Neighborhood, Bonding Moments, event finders) versus what becomes a Change Order if we want it later (subscription billing, the affiliate layer, the full recommendation engine). 3. One small Israeli-tax wording question on 7.3.4 — about which jurisdiction's rules I'm responsible to. Quick fix, friendly. All three are easy to land in 15 minutes if we walk through them together. Talk Sunday. Elad